Sunday, April 29, 2007

Remodel 6a

The living room floors are complete. What do we have left to do? Well, the bathroom downstairs still needs a countertop, faucets and a toilet. The attic needs a ladder and floor boards and the upstairs bathroom needs all of it's plumbing redone and the bathtub needs a new finish. We have moved into the downstairs bedroom and the babies room is on it's way to being ready.

We emptied our storage unit and we currently have all of our "stuff" in the garage. That's a bit of a headache but we are hoping that we can get everything in it's place in the next week or two.

I've attached a picture of me, sorry it's taken me so long to get one up on the blog. Not a great picture, took it myself without a tripod.


37 weeks


Sunday, April 22, 2007

Remodel 6

We're not done yet. As you can see we had to live in the living room for about 1-week while they put carpet in the office, babies room, downstairs bedroom and hallway along with painting the nursary. What do you think of the colour? It's Dill Pickle.
So as of today, we have moved into our new room downstairs, which we love, and we've moved back into the office. The downstairs bathroom still has some work to be done to it and this week I will be moving out as we are refinishing the hardwood floors in the living room. Yes, it went from very full to empty in one day. We're about 2-weeks from being finished and I'm 4-weeks from my due date. The nursary is currently storing everything from the living room and I can only hope and pray that I will be actually fixing up that room next weekend.
We were living in a studio (our living room) for a while

The bathroom is coming along

The garage got new cabinets

The downstairs bedroom now has carpet

The office also got new carpet, I wish I had painted it

The babies room got new carpet and a new paint job


Tuesday, April 10, 2007

Remodel 5a

I've got colour on my walls and I love it. Check it out, the hallways are Alaskan Skies, the bedroom is Cotswald and the bathroom is Meadow Trail . The vanity will be installed in the bathroom tomorrow along with the garage cabinets, the bathroom fixtures should go in sometime next week. The shower doors will be installed in about two weeks along with the carpet. At that point we move it to the upstairs. I wasn't too sure when we were going to get to this point...whew!







Saturday, April 07, 2007

Remodel 5

We're getting really close to being finished with the downstairs. The bathroom has been tiled, the walls have been primed, the trim and doors are up and the new window has been installed.
Next week the bathroom will be grouted, the walls will be painted, the vanity and bathroom fixtures will be installed as well as the garage cabinets.
Things are looking good and we seem to be on track for completion.
Pictures - Bedroom, hallway (linen closet) and bathroom